Presentations and Documents
The School Building Committee has made presentations to the City Council, School Committee, Community, and Neighborhoods during the Feasibility Study. The presentations can be accessed by clicking on the links below.
City Council Presentations
02/06/2018 City Council Meeting
04/17/2018 City Council Meeting
06/19/2018 City Council Meeting
08/21/2018 City Council Meeting
School Committee Presentations
All presentations made by The School Building Committee to the School Committee during the Feasibility Study can be accessed at the links below.
03/12/2018 School Committee Meeting
04/25/2018 School Committee Meeting
06/20/2018 School Committee Package
08/01/2018 School Committee Meeting
Community Presentations
All presentations made by The School Building Committee to the Community during the Feasibility Study can be accessed at the links below.
11/13/17: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
11/27/17: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
2/12/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
4/2/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
6/11/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
7/23/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
9/29/19: Fuller Middle School Community Presentation
9/29/19: Fuller Middle School Community Presentation
10/01/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00 PM)
10/6/19: Fuller Middle School Community Presentation
11/1/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00PM)
11/28/18: Fuller Middle School Library (Optional Fuller School Tour 5:30 / Presentation 6:00 - 8:00PM)
Neighborhood Presentations
All presentations made by The School Building Committee to the neighbors abutting the Fuller Middle School during the Feasibility Study can be accessed at the links below. If you live, work, or own a business in the general neighborhood and wish to attend a future neighborhood meeting, please send an email to Rochelle Santos.
Neighborhood Meeting Presentation - 08-03-19
PTO Presentations
All presentations made by members of the The School Building Committee or the Public Information Working Group to the Parent Teacher Organizations (PTO) throughout the District can be accessed at the links below.
Preliminary Design Options
Eight design alternatives were initially discussed and evaluated over the course of ten (10) School Building Committee meetings, several Academic Leadership Team meetings, and two (2) community forums. The committee focused on the following criteria when developing the options: educational benefits, cost, minimal disruption during construction, sustainability, community access, and transportation. The eight design alternatives explored were:
- Option 0.0 – Repair Only
- Option 0.1 – Renovation Only
- Option A – Renovations and Additions
- Option B.1 – Renovations and Additions – Tree Branch Plan
- Option B.2 – New Construction – Tree Branch Plan
- Option C.1 – Renovations and Additions – Folded Hands Plan
- Option C.2 – New Construction – Folded Hands Plan
- Option D – Construction – Butterfly Plan
The School Building Committee narrowed these 8 options down to 4 which can be seen Click in HERE and has since decided on the final design option - The Folded Hands Plan on April 30, 2018.