The MSBA requires an in depth analysis of the existing conditions of the building and site as part of the Feasibility Study. The existing conditions reports can be accessed by clicking on the links below.
Existing Conditions Report Part 1
1. MEP
a. Mechanical/HVAC - HVAC Report
2. Duct Cleaning Maintenance Report
b. Electrical - Electrical Report
c. Plumbing - Plumbing Report
d. Fire Protection - Fire Protection Report
3. Structural - Structure Report
4. Code/Accessibility - Code / Accessibility Report
5. Historic - Historic Report
6. Traffic - Traffic Report
7. Geotechnical - Geotechnical Report
8. Hazardous Materials - Fuller Hazmat Report
9. Deed - Fuller Deed
Existing Conditions Report Part 2
1. Geo-Environmental - Geo-Environmental Report